E21 Installation Manual

(Version: V1.09)

loading

Related Manuals for Estun E21

Summary of Contents for Estun E21

  • Page 1
    E21 Installation Manual (Version: V1.09)
  • Page 2: Table Of Contents

    E21 Installation Manual Contents Preface ………………….1 Chapter 1 Specification ………………… 3 1.1 Display ………………….3 1.2 Internal memory ………………..3 1.3 Electrical specification ………………3 Chapter 2 Installation ………………..5 2.1 Announcements before installation …………..5 2.2 Installation space and direction …………… 5 2.3 Installation environment ………………

  • Page 3
    7.2.2 Equipment grounding design …………….33 7.3 Protective measures ………………34 7.3.1 Measures to ensure electromagnetic compatibility ……….34 7.3.2 Instructions to E21 electromagnetic capability installation ……..36 7.3.3 Install freewheeling diode on relay …………..36 7.4 Demonstration of AC Asynchronies motor wiring ………. 37…
  • Page 4: Preface

    E21 Installation Manual Preface Target reader This manual guides the following operators to install, configure and maintain the E21 press break numerical control device:  Machine tool operators  Installation and maintenance personnel Range of application Installation and maintenance personnel can install and operate this device properly by referring to this manual.

  • Page 5
    E21 Installation Manual Low temperature; refer to JB-T 8832-2001 General requirements for numerical control device of machine tools, 0 ℃, 2hours. Low temperature store -20℃. Criteria: normal start up, normal operation. High temperature, refer to JB-T 8832-2001 General requirements for numerical control device of machine tools, 40 ℃, 2hours.
  • Page 6: Chapter 1 Specification

    E21 Installation Manual Chapter 1 Specification 1.1 Display LCD display Dimension of display window: 54.38mm*54.38mm Dot matrix: 160*160 Status light Green indicates running Red indicates stop 1.2 Internal memory Capable of storing 40 programs, each program includes 25 steps at most.

  • Page 7
    E21 Installation Manual Storage temperature: -20~55℃ Encoder specification Power supply: DC 12V Incremental encoder: single-ended output, with Z/C phase Output: voltage-type…
  • Page 8: Chapter 2 Installation

    Therefore, before turning on the power supply, check the connection of input output grounding and power supply wire.  Grounding terminal of E21 digital control device must be grounded in correct way, with low impedance lower than 0.3Ω.  Do not dismantle the device without authorization so as to avoid malfunction.

  • Page 9: Installation Dimension

    E21 Installation Manual 2.4 Installation dimension The installation method is panel mounting. Installation dimension and drawings are shown in Figure 2-1. Unit: mm 4-M4 pressure riveting screws High 8 mm Figure 2-1 Panel Installation Dimension…

  • Page 10: Installation Layout

    E21 Installation Manual 2.5 Installation layout 2.5.1 Layout of rear panel Rear panel block diagram is as shown in Figure 2-2, consisting of power port (POWER), input port (INPUT), output port (OUTPUT), encoder port (X, Y), and communication port (COMM).

  • Page 11
    E21 Installation Manual Socket number External port name External port description 7 pin. 24VDC, maximum load 10mA, INPUT opto-coupler isolation, maximum withstanding voltage 40V. Incremental encoder is 12V single-ended output, with pulse frequency up to 100KHz. Meanwhile, the port supplies power externally X-ENCODER (as input power of encoder).
  • Page 12: Overall Wiring Scheme

    E21 Installation Manual 2.5.3 Overall wiring scheme Overall wiring scheme is as shown in Figure 2-3. Figure 2-3 Overall wiring schemes…

  • Page 13: Electrical Wiring Scheme

    E21 Installation Manual 2.5.4 Electrical wiring scheme Electrical wiring scheme is as shown in Figure 2-4. 12V single-point 12V single-point incremental encoder incremental encoder Shell Encoder cable Encoder cable grounding shield layer shield layer Y-ENCODER X-ENCODER Shell grounding terminal … ……

  • Page 14: Definition Of Device Interface

    E21 Installation Manual 2.6 Definition of device interface 2.6.1 Definition of power interface Definition of terminal is as shown in Table 2-2. Table 2-2 Description of power terminal Terminal No. Signal Description Input terminal of device power, connect to DC +24V.

  • Page 15: Definition Of External Output Interface

    E21 Installation Manual Terminal No. Signal Description Y-axis reference point signal, DC +24V signal input, connect Y-EOT to low limit signal of Y-axis block generally. Block touches reference point switch, +24V signal is connected. Count Retain Retain The pump signal must be connected to DC 24V when the MRDY machine is normally running.

  • Page 16: Definition Of Encoder Interface

    E21 Installation Manual Terminal No. Signal Description COM2 Common port of system output signal must connect to 0V of I/O power supply. 2.6.4 Definition of encoder interface Encoder interface is DB-9 plug (female), definition of terminal is as shown in Table 2-5.

  • Page 17: Chapter 3 Parameter Description Of Machine Tool

    E21 Installation Manual Chapter 3 Parameter Description of Machine Tool 3.1 Enter parameter page Steps to entering parameter page are as below. Step 1 Power on, and press two times to enter Programming Constant page, as shown in Figure 3-1. On this page, program constant can be set.

  • Page 18: Parameter Description

    E21 Installation Manual <Note>: You can directly enter Teach Page by input password “1212” and press on Program Constant page. Step 4 Input password 36987 on the CONST page to enter Motor-Speed Detection page, as shown in Figure 3-4. 1.X Motor Dec.

  • Page 19
    E21 Installation Manual Name Default value Range Description  mm/inch 0 or 1 0: Metric  1: inch  中文/English 0 or 1 0: Chinese  1: English Release Time 0~99.99s Interval between valid yield signal and unloading output when system starts.
  • Page 20
    E21 Installation Manual Name Default value Range Description  X-Enable 0 or 1 0:disable  1:enable  Encoder Dir. 0 or 1 0:decreasing  1:increasing  Teach. En. 0 or 1 0:disable, enable the orientation function.  1:enable, enable the teaching function.
  • Page 21
    E21 Installation Manual Name Default value Range Description  Repeat Enable 1~99999999 0:disable  1:enable Repeat Time 0~99.99s Interval of back gauge reposition when repeat position Mute Dis. 0~9999.999mm Conversion distance between high speed and low speed. Motor lowers speed when enter this range.
  • Page 22
    In general, the fixed frequency is 50Hz. [Note] The parameter description of X-axis and Y-axis are the same. If the Vacon transducer is used, the parameter setting for communicating E21 device is as below: E21 Communication Parameter Setting of Vacon P2.1 →…
  • Page 23
    E21 Installation Manual The parameter description of Motor-Speed Detection is as shown in Table 3-1. Table 3-1 Parameter description of Motor-Speed Detection Name Default Range Description Whether to enable the Motor-Speed Detection function. X-Motor Det. 0 or 1  0: Disabled …
  • Page 24
    E21 Installation Manual Name Default Range Description X-axis motor begins accelerate from High-speed to the detection end. It will not detect X-axis T3 0~9.99s the motor speed in this setting value. This parameter applies to only the inverter. [Note] The parameter description of X-axis and Y-axis are the same.
  • Page 25: Chapter 4 Diagnosis

    E21 Installation Manual Chapter 4 Diagnosis When diagnosis is in progress, do not start oil pump. 4.1 Enter diagnosis page This system provides diagnosis tests for input, output, keyboard, FRAM, encoder and LCD, etc. Steps to enter diagnosis page are as follows: Step 1 Power on, the device displays the single-step programming page, Stop Indicator lights.

  • Page 26: Output Diagnosis

    E21 Installation Manual 4.3 Output diagnosis When you enter the DIAGNOSE page, select 2. OUT DIAG. to enter OUT DIAG. page, as shown in Figure 4-3. [Operation Guide] Using the Arrow Key to move the cursor to the corresponding port…

  • Page 27: Fram Diagnosis

    E21 Installation Manual 4.5 FRAM diagnosis When you enter the DIAGNOSE page, select 4. FRAM DIAG. to enter FARM DIAG. page, as shown in Figure 4-5. , the page displays “Diagnosing”. When the diagnosis is [Operation Guide] Press success, the page will display “The result is: OK”. However, if the page long displays “Diagnosing”, it indicates the memory is failure.

  • Page 28: Lcd Diagnosis

    E21 Installation Manual 4.7 LCD diagnosis When you enter the DIAGNOSE page, select 6. LED DIAG. to enter LED DIAG. page, as shown in Figure 4-7. [Operation Guide] Press , the device will star to diagnose the LCD. To stop the diagnosis, press LCD DIAG.

  • Page 29: Chapter 5 Commissioning

    If necessary, cut down motor power immediately to avoid accident. 5.1 Preparation before Commissioning  Check E21 power line, ground wire, input/output signal wire and encoder plug for reliable and accurate connection.  Check whether output voltage of 24V switch power is normal or not.

  • Page 30: Action Commissioning

    E21 Installation Manual  Over.Dis.: 5.00  Repeat Enable: 1  Repeat Time: 1.00  Stop Dis.: 100  Mute Dis.: 4000  Overrun En.: 0 (Bilateral orientation is enabled) Y-Axis parameter setting Y-axis parameter setting: the method is similar to the setting of X axis parameter 5.2.2 Action commissioning…

  • Page 31: Counting Commissioning

    E21 Installation Manual 5.2.4 Counting commissioning Edit multistep program on programming page (setting number of work piece is over 1, single step is excluded), press “Start”, depress pedal to dry running when X, Y axis are in position (note Y axis position and pressure), observe whether counting has increased;…

  • Page 32: Chapter 6 Maintenance

    E21 Installation Manual Chapter 6 Maintenance 6.1 Instructions to maintenance In order to use this system safely and properly, follow the instructions.  When power is on or system operates normally, do not open cover plate or panel as it may damage the components.

  • Page 33: Periodic Inspection

    E21 Installation Manual Inspection item Standard content Standard Treatment specification Connection status Check terminal Screw is not loose Fastening screw for loosening terminal screw. LED display status Check whether LED LED (green) indicate display is correct. system running, LED (red) indicate system stop.

  • Page 34
    E21 Installation Manual Inspection item Standard Standard Treatment content specification Install Tension, Mobile module Module must Secure the mobility be installed screw. If securely. CPU and I/O module loses, fasten them by screws. Dust and Visual No dust or Remove and…
  • Page 35: Chapter 7 Appendix

    7.2.1 Ground classification in equipment cabinet Ground in equipment cabinet is divided into three categories:  Signal ground: for example, signal reference in E21 controller;  Shield ground: the shield layer of communication cable can prevent the system from external interference and hinder internal noise interfere other equipment. The ground shield layer connected to be called shield ground must connect to protective ground.

  • Page 36: Equipment Grounding Design

    RC net. RC network of E21 is integrated inside the product with one end connect to signal ground, and the other end connect to ground (three pins of POWER terminal), as shown in Figure 7-1.

  • Page 37: Protective Measures

    7.3 Protective measures 7.3.1 Measures to ensure electromagnetic compatibility E21 and its components are specially designed for industrial environment with strong electromagnetic compatibility. But when install and operate, take possible interference by the outside into account, and improve reliability and stability of the system.

  • Page 38
    E21 Installation Manual Coupling mode Cause Typical cases Inductive Changing current flows Transformer; coupling through current loop. Contactor and relay pull-in or disconnect; High frequency signal cable, etc. Radio frequency Space electromagnetic field coupling makes guide line generate induced voltage current.
  • Page 39: Instructions To E21 Electromagnetic Capability Installation

    E21 Installation Manual 7.3.2 Instructions to E21 electromagnetic capability installation  E21 may be installed outside the cabinet. If work environment is poor, keep E21 close to cabinet as much as possible;  Metal housing shall connect to protective ground via earth conductor, and ground resistance shall be no higher than 0.3 ohm;…

  • Page 40: Demonstration Of Ac Asynchronies Motor Wiring

    E21 Installation Manual 7.4 Demonstration of AC Asynchronies motor wiring Demonstration of AC asynchronism motor wiring is as shown in the following figure. Power COMMUNICATION ENCODER 1, 6 2, 7 RS485A RS485B Others 8, 9 Shell EARTH Shell EARTH…

  • Page 41
    E21 Installation Manual…

Главное содержание

Контроллеры станков с ЧПУ

  • Контроллер ESTUN E21 v. 1.06 (русский) — Руководство по эксплуатации (инструкция) контроллера для гидравлических листогибов.

Руководство (инструкция) Estun E21

  • Контроллер ESTUN E21S v. 1.06 (русский) — Руководство по эксплуатации (инструкция) контроллера для гидравлических листорезных станков.

Estun E21S на русском

  • Контроллер ESTUN E210 v. 1.02 (русский) — Руководство по эксплуатации (инструкция) контроллера для гидравлических листогибов.

Руководство (инструкция) Estun E210

  • Контроллер DELEM DA-52s V0812 для ПО Вер.3.2 (русский) — Руководство по эксплуатации (инструкция) контроллера для гидравлических листогибов.

Руководство (инструкция) Delem DA-52s

  • JQ LASER BCS100 (русский) V.2.25 — Руководство пользователя контроллера высоты для станков лазерной резки металла с ЧПУ

Руководство (инструкция) BCS100

  • Контроллер PA 8000 Ред.04.09 Вер.ПО 3.Х  (русский) — Руководство по эксплуатации (инструкция) контроллера.

Руководство (инструкция) Power AutomationPA8000

Контроллер распределенного мониторинга температуры OTS3/LHD3

  • Контроллеры серии OTS3/LHD3 — инструкции по безопасности

  • Контроллеры серии OTS3/LHD3 — руководство по установке

  • Контроллеры серии OTS3/LHD3 — руководство по эксплуатации

Предыдущая работа

Просмотров: 1173
Дата добавления: 13.02.17 в 15:19
Дата обновления: 19.02.20 в 14:05

Перевод руководства по эксплуатации контроллера листогиба Estun E21.

Следующая работа

f_49358a1a44bcc71d.pdf

pdf, 274.80 Кб  

f_47958a1a44bdd0e8.pdf

pdf, 262.64 Кб  


Продолжая пользоваться сайтом, вы соглашаетесь с

условиями использования файлов cookie


Chapter 5 Commissioning ………………………………………………………………………….. 26

5.2 Procedure ………………………………………………………………………………………… 26

5.2.2 Action commissioning ……………………………………………………………………………… 27

5.2.3 Precision commissioning …………………………………………………………………………. 27

5.2.4 Counting commissioning …………………………………………………………………………. 28

5.2.5 Retreat commissioning ……………………………………………………………………………. 28

Chapter 6 Maintenance ……………………………………………………………………………….. 29

6.2 Routine inspection …………………………………………………………………………….. 29

6.3 Periodic inspection ……………………………………………………………………………. 30

Chapter 7 Appendix ……………………………………………………………………………………. 32

7.2 Grounding design ……………………………………………………………………………… 32

7.3 Protective measures ………………………………………………………………………….. 34

E21 Installation Manual

Estun E21 Controller Manual

Preface

This manual describes operation of E21 numerical control device and is meant for operators who are instructed for operation of the device. Operator shall read through this manual and know operation requirements before using this device.

Copy right is preserved by ESTUN. It is not allowed to add or delete part or all of the manual content without ESTUN’s consent. Do not use part or all of manual content for the third party’s design.
E21 device provides complete software control and has no mechanical protection device for operator or the tool machine. Therefore, in case of malfunction, machine tool must provide protection device for operator and external part of the machine tool. ESTUN is not responsible for any direct or indirect losses caused by normal or abnormal operation of the device.

ESTUN preserves the right to modifying this manual in the event of function adding or print error.

1.1 Product introduction


This product is equipped with press brake machine dedicated numerical control device which is applicable to various users. On the basis of ensuring work precision, the cost of numerical control bending machine is reduced significantly.

Features of this product are listed below:

 Positioning control of back gauge.

 Intelligent positioning control.

 Unilateral and bidirectional positioning which eliminates spindle clearance effectively.

 Retract functions.

 Automatic reference searching.

 One-key parameter backup and restore.

 Fast position indexing.

 40 programs storage space, each program has 25 steps.

 Power-off protection.

1.2 Operation panel


Operation panel is shown in Figure 1-1.

Figure 1-1 Operation panel

Functions of panel keys are described in Table 1-1.

Table 1-1 Description of key functions

Key Function description
Delete key: delete all data in input area on left bottom of displayer.
Enter key: confirm the input content. If no content is input, the key has the similar function to direction key .
Start key: automatic start-up, top left corner of the key is operation indicator LED. When operation is started, this indicator LED is on.
Stop key: stop operation, top left corner of the key is Stop indicator LED. When initialize normal start-up and no operation, this indicator LED is on.
Left direction key: page forward, cursor remove
Right direction key: page backward, cursor remove
Down direction key: select parameter downward
Function switch: switch over different function pages
Symbolic key: user input symbol, or start diagnosis
Numeric key: when setting parameter, input value
Decimal point key: when set up parameter, input decimal point.
Manual movement key: in case of manual adjustment, make adjustment object move in forward direction at low speed.
Manual movement key: in case of manual adjustment, make adjustment object move in backward direction at low speed
High speed selection key: in case of manual adjustment, press this key and press simultaneously, make adjustment object move in increasing direction at high speed, then press , make adjustment object move in decreasing direction at high speed.

1.3 Displayer


E21 numerical control device adopts 160*160 dot matrix LCD displayer. The display area is shown in Figure 1-2.

Figure 1-2 Display area

 Title bar: display relevant information of current page, such as its name, etc.

 Parameter display area: display parameter name, parameter value and system information.

 Status bar: display area of input information and prompt message, etc.

The paraphrases of shortening on this page are as shown in Table 1-2.

Table 1-2 The paraphrases of shortening

Shortening Description
X The current backgauge position
Y The current slider position
XP The desired backgauge position
YP The desired slider position
DX Backgauge retract distance
HT Holding delay
DLY Retracting delay
PP Preset workpiece
CP Current workpiece

Part2 — Operation Instruction

2.1 Basic operation procedure


Basic switch over and operation procedure of the device is shown in Figure 2-1.

Figure 2-1 Basic Operational Flow

2.2 Programming


The device has two programming methods, which are single-step programming and multi-step programming. User can set up programming according to actual demand.

2.2.1 Single-step programming

Caution: When the parameter X or Y displays ******** on the page, please do not enter the RUN page or Manual page, unless you have reset the teach function of X-axis or Y-axis.

Single-step programming is generally used for processing single step to finish work piece processing. When controller is power on, it will automatically enter single-step program page.

Operation steps

Step 1 After starting up, the device will enter setting up page of single-step program automatically, as shown in Figure 2-2.

Figure 2-2 Single-step program setting page

Step 2 Press , select parameter which needs to be set up, press numerical key to input program value, press to complete input.

[Note] Parameter can only be set when Stop indicator is on.

Setting range of singe step parameter is shown in Table 2-1.

Parameter name Unit Set up range Remarks
X mm/inch / Current position of X axis, unable to be modified.
Y mm/inch / Current position of Y axis, unable to be modified.
XP mm/inch 0~9999.999 Program position of X axis.
YP mm/inch 0~9999.999 Target position of Y axis.
DX mm/inch 0~9999.999 Retract distance of X axis.
HT s 0~99.99 The time between concession signal valid and end hold time output.
DLY s 0~99.99 In case of single step, delay time for X axis concession.
PP / 0~99.99 Number of preset work piece
CP / 0~99.99 Number of current work piece.

Step 3 Press , system will execute according to this program, as shown in Figure 2-3.

Figure 2-3 Single step operation page

  • Operation example

On single-step program page, program bending depth to 100.0mm, back gauge position to
80.00mm, retract distance to 50mm, concession waiting time to 2s, holding time to 3s, work
piece to 10.
Operation steps are shown in Table 2-2.

Table 2-2 Operation steps of single step example

Operation steps Operation
Step1 Press , select “XP” parameter.
Step2 Input 80.00 by numerical key.
Step3 Press , confirm setting of this parameter.
Step4 Press , select “YP” parameter.
Step5 Input 100.0 by numerical key.
Step6 Press , confirm set up of this parameter.
Step9 Press , select “DX” parameter, “DLY”
parameter, “HT” parameter, “PP” parameter respectively.
Step10 Set up parameter to 50mm, 2s, 3s, 10, 0 by numerical key.
Step11 Press , system execute according to this program.

2.2.2 Multi-step programming

Caution: When the parameter X or Y displays ******** on the page, please do not enter the RUN page, unless you have reset the teach function of X-axis or Y-axis.

Multi-step program is used for processing single work piece of different processing steps, realize consecutive implementation of multi-steps, and improve processing efficiency.

Operation step

Step 1 Power on, the device displays the single-step parameter page automatically.
Step 2 Press , switch to program manage page, as shown in Figure 2-4.

Figure 2-4 Program management page

Step 3 Press , select program serial number, or input program number directly, such as input “1”.

Step 4 Press , enter multi-step program setting page, as shown in Figure 2-5.

Figure 2-5 Multi-step

Step 5 Press , select multi-step programming parameter which requires set up, input
setting up value, press , and the set up takes effect.
Step 6 In completion of set up, press , enter step parameter set page, as shown in Figure 2-6.

Figure 2-6 Step parameter set page

Step 7 Press , select step parameter that needs to be set up, input program value, press , and the setup takes effect.
Step 8 Press to switch over between steps. If the current step is the first step, press to enter the last page of step parameter setting; if the current step is the last one, press to enter the first page of step parameter setting.

Multi-step parameter setting range is shown in Table 2-3.

Table 2-3 Multi-step parameter setting range

Parameter name Unit Setting range Remarks
Step number of program / 0~25 Set up total processing step number of this program
Preset work piece number / 0~9999 Number of work piece to be processed, decreasing piece when more than zero; negative increasing count.
Current work piece number / 0~9999 Number of finished work piece
Concession delay s 0~99.99 Time between retract signal and concession execution.
Holding time delay s 0~99.99 Time between concession signal and end pressurize output
X mm/inch / Current position of X axis, can’t be modified;
Y mm/inch / Current position of Y axis, can’t be modified;
X target position mm/inch / Program position of X axis;
Y target position mm/inch / Target position of Y axis;
concession distance mm/inch 0~9999.999 Distance of X axis concession;
Repeat times / 1~99 Repeat times required by this step.

Step 9 Press , system will operate according to this program, as shown in Figure 2-7.

Figure 2-7 Multi-step programming operation page

  • Operation example

[Background] One work piece requires processing 50 as shown below;

 First bend: 50mm;

 Second bend: 100mm;

 Third bend: the other direction 300mm;
[Analysis] according to work piece and technological conditions of machine tool:

 First bend: X axis position is 50.0mm; Y axis position is 85.00mm, concession 50mm;

 The second bend: X axis position is 100.0mm; Y axis position is 85.00mm, concession 50mm;

 The third bend: X axis position is 300.0mm; Y axis position is 85.00mm, concession 50mm;
Edit processing program of this work piece on No. 2 program.
Operation procedure is shown in Table 2-4.

Table 2-4 Operation steps of multi-step programming example

No. Operation
Step1 On single step parameter setting page, press to enter program selection page.
Step2 Input “2”, press , enter multi-step general parameter setting page of
program 2.
Step3 Select “Program step”, input “3”, press , the setting takes effect.
Step4 Select “number of preset work piece”, input “50”, press , the setup
takes effect.
Step5 Similar to step 3 and step 4, set “current work piece number”, “concession delay” and “pressurize time” to 0, 400, 200 respectively.
Step6 Press to enter first step setup page of step parameter
Step7 Select “X target position”, input 50, press , the setup takes effect.
Step8 Select “Y target position”, input 85, press , and the setup take effect
Step9 Similar to step 7, 8, set up “concession distance” and “repeat times” to 50, 1
respectively.
Step10 Press to enter second step setup page of step parameter, the setup
method is similar to that of step one.
Step11 Press again, to enter third step setup page of step parameter, the setup method is similar to that of step one and step two.

<Note>

■ In completion of multi-step programming, return to start step before launching the system; otherwise, the program will start position processing at current step.

■ Press left and right direction key to circulate page turning and browsing among all step parameters.

■ Program can be called and revised again.

■In completion of processing all work pieces (50 in the example), system stops automatically. Restart directly will start another round of processing 50 work pieces.

2.3 Parameter setting


User can setup all parameters required for normal operation of the system, including system parameter, X axis parameter and Y axis parameter.
Step 1 On program management page, press to enter programming constant page, as shown in Figure 2-8. On this page, programming constant can be set.

Figure 2-8 Programming constant page

Range of programming constant setup is shown in Table 2-5.

Table 2-5 Range of programming constant setup

Parameter name Unit Range Default Remarks
mm/inch /  0 or 1 0 0: mm, 1: inch
中文/English / 0 or 1 0 0: Chinese, 1: English
Release Time s 0 to 99.99 0.3 Continue time of unloading output
after starting the system.
Pulse Time s  Time s 0.000 to 1.000 0.2 The duration of the pulse signal.
Version / / / Software version information, V
refers to version. 1: indicates version number. 0: indicates version level.

Step 2 Input password “1212”, press to enter the Teach Page, as shown in Figure 2-9.

Figure 2-9 System parameter setting page

Step up parameter, parameter setup range is shown in Table 2-6.

Table 2-6 System parameter setup range

Parameter name Unit Range Default Remarks
X-tea.in mm  0~9999.99 10 In teach enable, input current
position of X axis
Y-tea.in mm  0~9999.99 10 In teach enable, input current
position of Y axis

<How to Teach>: You can directly measure the positions of slider and back gauge. If the measurement is difficult, you can program and operate any one process, and then measure the accomplished workpiece.

Step 3 Press , return to programming constant page.
—-End

2.4 Manual adjustment


In single-step mode, axis movement can be controlled by pressing key manually. This method helps user to adjust machine tool and work piece.
Step 1 On single step parameter setup page, press or to enter manual page, as shown in Figure 2-10.

Figure 2-10 Manual page

Step 2 According to your actual requirement, following the above table to adjust the position of the axis. — If the drive mode of the corresponding axis is common motor:

Press Key Status Direction Running Time Speed
Stop increasing Press time Slow
Run increasing  Press time (if it is less than “Pulse Time”)
 Pulse Time (If it is less than Press time)
Slow
Stop decreasing Press time Slow
Run decreasing  Press time (if it is less
than “Pulse Time”)
 Pulse Time (If it is less than Press time)
Slow
Stop increasing Press time Slow
Run increasing Press time Slow
Stop decreasing Press time Slow
Run decreasing Press time Slow

<Note>: When the system is on run status, the operation of manual adjustment is just valid for the X-axis.

— If the drive mode of the corresponding axis is frequency:

Press Key Status Direction Running Time Speed
Stop increasing Press time Slow
Run /
Stop decreasing Press time Slow
Run /
Stop increasing Press time Fast
Run /
Stop decreasing Press time Fast
Run /

Step 3 Press return to single step parameter setting page.
—-End

Part3 — Alarm

The device can detect internal or external abnormity automatically and send out alarm prompt. Alarm message is available on alarm list.
Step 1 On programming management page, press to enter programming constant page.
Step 2 On programming constant page, press to enter “Alarm history” page to view all alarm history.
As shown in Figure 3-1, the latest 6 alarms, alarm number and causes can be viewed on this page

Figure 3-1 Alarm history page

Alarm history and message is shown in Table 3-1.

Table 3-1 Alarm number and alarm message

Alarm number Alarm name Alarm description
A.02 XPos < minimum Move X-axis forwards in Manual Movement.
A.03 XPos > maximum Move X-axis backwards in Manual Movement.
A.04 YPos < minimum Move Y-axis forwards in Manual Movement.
A.05 YPos > maximum Move Y-axis backwards in Manual Movement.
A.06 X out of lmt. Re-teach the position of X-axis.
A.11 Count reached shut-down Rerun, the alarm is cleared automatically.
A.12 Beam is not on upper dead point Step on the Foot Up Switch, moving the slider to the TDC, and the alarm will be cleared automatically.
A.13 X Un-teachIn Re-teach the position of X-axis.
A.14 Y Un-teachIn Re-teach the position of Y-axis.
A.21 Oil pump not started Check whether the pump signal is connected, and check whether the pump switch is on.
A.22 Encoder failure Check whether the encoder wiring is normal.
A.25 Drive mode err Reprogram the Drive Mode for X-axis and Y-axis.
A.26 X Stop Err Check whether the back gauge motor is run normally
A.27 Y Stop Err Check whether the slider motor is run normally.
A.28 X V2 Err Check whether the back gauge motor is run normally.
A.29 X V3 Err Check whether the back gauge motor is run normally.
A.30 Y V2 Err Check whether the slider motor is run normally.
A.31 Y V3 Err Check whether the slider motor is run normally.
A.32 XPos < 0 Move X-axis forwards to the setting range in Manual Movement.
A.33 YPos < 0 Move Y-axis forwards to the setting range in Manual Movement.
A.41 Parameter storage error Back to factory for repairing

Appendix Common Fault and Troubleshooting


Fault phenomena Trouble shooting
The screen don’t display when
power on.
 The terminal of power supply wiring is error. Follow the nameplate to rewire.
 The source voltage is too low.
 The connector is not connected well.
The back gauge motor doesn’t run when X-axis is operated, but the
slider motor runs
The wires of these two motor are in reverse, please rewire.
The motor doesn’t run when
operating.
 Check whether the machine is impeded, or whether the slider is back to TDC
 Check whether the motor wire is connected well.
The motor can’t mutually convert
from high to low
 Check whether the signal is in effect, or whether
frequency converter is normal.
 Check whether parameter Mute Dis. is programmed correctly.
The step can’t be changed in
Multi-Step mode.
Check the START terminal is connected to +24V when
the slider is on TDC.
The counter doesn’t work in
Multi-Step mode.
Check the START terminal is connected to +24V when
the slider is on TDC.
Lose control of the system  Check whether the encoder cable is connected well.
 Check whether the motor direction wiring (X+, X-, Y+, Y-)  is correct.
The actual position of X-axis or Y-axis is unchanged or unshown. Check whether the encoder cable is connected well or
correctly.

—End

Понравилась статья? Поделить с друзьями:

А вот и еще наши интересные статьи:

  • Оформление вкс на работу пошаговая инструкция 2022
  • Руководства материнские платы gigabyte
  • Руководство по эксплуатации холодильника атлант двухкамерный
  • Самсунг gt 5722 инструкция по применению
  • Neoline x cop 9000 руководство

  • 0 0 голоса
    Рейтинг статьи
    Подписаться
    Уведомить о
    guest

    0 комментариев
    Старые
    Новые Популярные
    Межтекстовые Отзывы
    Посмотреть все комментарии